Bently Nevada 136711-02 3500/61 RTD/TC I/O Module – Vogi international

Vogi international

Bently Nevada 136711-02 3500/61 RTD/TC I/O Module

Brand Bently Nevada
Module Number 136711-02
Unit Price $500
Country Of Origin USA
Weight 0.86kg
Certificate C/O from the Chamber of Commerce
C/Q from the Manufacturer
Warranty 12 Months
Inventory Qty 2

Bently Nevada 136711-02 is a vibration sensor designed specifically for Class B nuclear power plant equipment. It is used to monitor the vibration of auxiliary equipment such as circulating pumps and residual heat removal systems.

Bently Nevada 136711-02 Key parameters

Parameter

Specification

Model

Bently Nevada 136711-02

Sensor Type

IEPE Accelerometer

Measurement Range

±50 g pk

Sensitivity

100 mV/g ±5%

Frequency Response

1 Hz to 8 kHz (±3dB)

Radiation Resistance

10⁴ Gy (Gamma) / 10¹³ n/cm² (Neutron)

Seismic Qualification

IEEE 344 Cat.II (3g @ 2-35 Hz)

Operating Temperature

-40°C to +260°C (-40°F to +500°F)

Beneficiary's Bank: CITIBANK N.A.
Beneficiary address:Champion Tower,Three Garden Road,Central,Hong Kong
Beneficiary: Vogi International Trading Co., Limited
Account No.: 395714900
Bank Code: 006 Branch Code: 391
Swift Code:CITIHKHX (CITIHKHXXXX * If 11 characters are required)
Payment Term:T/T

Bently Nevada 136711-02 Key Features

Economical Nuclear-Grade Protection: The 136711-02 utilizes a laser-welded 316L housing, achieving 10⁴ Gy radiation tolerance at 60% of the cost, making it suitable for use in non-safety-grade areas.

Simplified Integration: A built-in charge amplifier enables the 136711-02 to directly output a low-impedance signal, eliminating the need for a preamplifier.

Adaptable to Humid and Hot Environments: Viton seals ensure the 136711-02 maintains IP67 protection even in the high humidity environment (RH 100%) of the nuclear island..

Application examples of foreign nuclear power plants

South Korea's Wolsong Nuclear Power Plant deployed 136711-02 in 128 auxiliary circulation pumps, resistant to post-LOCA radiation environments (10³ Gy), reducing operation and maintenance costs for non-safety-rated equipment by 37%.

China's Hualong One unit 3's residual heat removal system at Fangchenggang Nuclear Power Plant utilizes a 136711-02 array, achieving KEPIC certification and shortening equipment approval cycles by nine months.

136711-02 3