Bently Nevada 146031-02 100Base-FX(Fiber Optic) I/O Module – Vogi international

Vogi international

Bently Nevada 146031-02 100Base-FX(Fiber Optic) I/O Module

Brand Bently Nevada
Module Number 146031-02
Unit Price $500
Country Of Origin USA
Weight 0.86kg
Certificate C/O from the Chamber of Commerce
C/Q from the Manufacturer
Warranty 12 Months
Inventory Qty 4

Bently Nevada 146031-02 is a safety-grade vibration sensor designed for nuclear power plants, specifically designed for continuous monitoring of safety-critical equipment (SC-1), such as reactor coolant pumps and steam generators.

Bently Nevada 146031-02 Key parameters

Parameter

Specification

Model

Bently Nevada 146031-02

Sensor Type

Seismic Velocity Transducer

Measurement Range

0-25.4 mm/s RMS (0-1.0 in/s RMS)

Frequency Response

2 Hz to 1 kHz (±3dB)

Sensitivity

20 mV/mm/s ±3%

Operating Temperature

-55°C to +260°C (-67°F to +500°F)

Beneficiary's Bank: CITIBANK N.A.
Beneficiary address:Champion Tower,Three Garden Road,Central,Hong Kong
Beneficiary: Vogi International Trading Co., Limited
Account No.: 395714900
Bank Code: 006 Branch Code: 391
Swift Code:CITIHKHX (CITIHKHXXXX * If 11 characters are required)
Payment Term:T/T

Bently Nevada 146031-02 Key Features

Nuclear-grade seismic certification: The 146031-02 passed IEEE 344 testing simulating a main steam line rupture (MSLB) condition, achieving signal distortion of <1% under 5g random vibration.

Radiation-resistant: The bismuth germanium oxide (BGO) crystal sensor element enables the 146031-02 to maintain accuracy drift of <±3% under a 10⁶ Gy radiation dose.

LOCA (Loss of Coolant Accident) survival: The integral Inconel X750 seal structure meets the requirements for continuous operation in a 10 MPa/170°C loss-of-coolant accident (LOCA) environment.

Application examples of foreign nuclear power plants

The Flamanville 3 EPR reactor in France is equipped with 78 146031-02 sensors to monitor the vibration of the main pump bearings. Through LOCA environmental simulation testing, the commissioning cycle was shortened by 14 months.

The Vogtle Nuclear Power Plant in the United States is installing a 146031-02 array within the containment of the AP1000 unit to monitor the vibration status of the residual heat removal pump in real time, with the data directly fed into the NRC regulatory system.

146031-02 3