ABB PP874M 3BSE069466-600
| Brand | ABB |
| Model Number | PP874M |
| Order Number | 3BSE069466-600 |
| Unit price | $6000 |
| Country Of Origin | Switzerland and Sweden |
| Weight | 1.5KG |
| Certificate |
C/O from the Chamber of Commerce C/Q from the Manufacturer |
| Warranty | 12 Months |
| Inventory Qty | 3 |
ABB PP874M 3BSE069466-600 is a Panel 800, it works primarily in an object-oriented way, making it easy to understand and use. All panel 800 version 6 are developed to satisfy the demands of human-machine communication.

Account Number 88800006406771
Account name Vogi International Trading Co., Limited
(* If the account name exceeds the available space, please continue in the address field.)
SWITF/BIC Code WIHBHKHHXXX
Bank name OCBC Hong Kong Branch
Bank address 161 Queen's Road Central, Central, Hong Kong
Country/Region Hong Kong (China)
Account type Business Account
Bank code 035
Payment method For the payment of goods, please make a FPS/CHATS/SWIFT Payment
Notes Please include the following memo/message to receiver when making a payment: [Buyer Name] [Invoice/Contract Number] [Product]
Install process as below
Unpack and check the delivery. If damage is found, notify the supplier.
- Place the operator panel on a stable surface during installation. Dropping the operator panel or letting it fall may cause damage.
- To cut a correct opening for the operator panel, use the cut out dimensions in the outline drawing.
- Secure the operator panel in position using all the fastening holes and the provided brackets and screws:
- Connect the cables in the specified order, according to the drawing and steps below. The operator panel must be brought to ambient temperature before it is started up. If condensation forms, ensure that the operator panel is dry before connecting it to the power outlet.
Ensure that the operator panel and the controller system have the same electrical grounding (reference voltage level), otherwise errors in communication may occur.
Ensure that the voltage and polarity of the power source is correct.
Separate high voltage cables from signal and supply cables.
Shielded communication cables are recommended.
Connect cable A. – Connect cable B, using an M5 screw and a grounding conductor (as short as possible), that is sized correctly according to local electrical codes. – Connect cable C. – Connect cable D. .
- Carefully remove the protective film over the operator panel display, take care to avoid static electricity that could damage the panel.

